FLIRT Akku 2-car unit for Pfalznetz

Rail vehicles
Mainline
FLIRT
Highlight
FLIRT Akku
  • Download data sheet

The FLIRT Akku is the battery-operated version of the FLIRT series. In late 2021, the association ZÖPNV Süd commissioned Deutsche Bahn with the acquisition of 44 two car FLIRT Akku units. The battery-operated trains will cover the routes of the Palatinate network starting in December 2025.

Full service image

Designed for non-electrified and partially electrified sections, the FLIRT Akku is particularly versatile. The batteries can be charged both while the train is travelling with a connection to an overhead contact line, as well as at electrified terminal stations. The braking energy is also fed back into the batteries. This allows the train to be used in a manner that is both efficient and saves energy. The train, which is equipped with lithium-ion batteries, will operate on the Palatinate network and consist of two cars with extra-long car bodies. The fully air-conditioned Deutsche Bahn FLIRT Akku offers bright passenger compartments with a passenger WLAN system, as well as generously proportioned multipurpose areas. There is space for a total of 325 passengers, including 172 seated passengers.

Technical features

Technology

  • Automatic central buffer coupler

  • Lightweight aluminium construction

  • Smooth running thanks to air-suspended running gear

  • Overhead line with 15 kV as well as overhead linefree operation with lithium-ion traction battery

  • Fast charging of the lithium-ion traction battery via 15 kV overhead line

Comfort

  • Bright, pleasant passenger compartment

  • Air-conditioned passenger compartment and driver’s cab

  • Generously proportioned multifunctional zone at all entrance areas

  • 3 passenger doors on each side

  • Sliding steps at all doors

  • Bicycle parking spaces/wheelchair areas

  • State-of-the-art passenger information system

  • Universal WC in accordance with TSI PRM

  • WLAN

Personnel

  • Ergonomically designed driver’s cab

Reliability / Availability / Maintainability / Safety

  • Complies with crash standard EN 15227

  • Complies with the requirements of TSI PRM and TSI Noise

Media Releases